Request: create event variable timing

Started by creepyguyinblack, July 20, 2017, 12:44:05 AM

Previous topic - Next topic

creepyguyinblack

I don't know if this is beyond the scope of what a mod can do but I would like to be able to have some algebraic options for the timing of 'create incident' in the scenario editor, for both single incidents and a separate field for repeating incident timing, such as if I want to wait 30 days for the first triggering of an incident but then have it repeat every 5 days after. Also I'd like to have some randomness introduced through +/- x where x is any value less than the base value, ex: 10 +/- 5 would have the incident happen between 5 and 15 days. For repeating incidents, I'd also want to use n, where n is the number of times this incident has been triggered, so after that first one, I could put in the repeat field: 5 +/-2 + n*5 to have further incidents occur 3 to 7 days later, plus 5 for each time it already has happened. Thoughts?