[MOD REQUEST] More work priority numbers.

Started by SnoggyTheBear, April 14, 2017, 11:08:20 AM

Previous topic - Next topic

SnoggyTheBear

Having 1-4 in my colony is sometimes frustrating and don't start giving me tips on how to manage a work tab. What about something like 1-8?

dburgdorf

I don't actually use it myself, but I believe Fluffy's Work Tab both breaks down work types into their component elements, allowing for more detailed settings of exactly what each pawn is and isn't supposed to do, and allows priorities to be assigned on a 1-9 scale instead of a 1-4 scale.
- Rainbeau Flambe (aka Darryl Burgdorf) -
Old. Short. Grumpy. Bearded. "Yeah, I'm a dorf."



Buy me a Dr Pepper?

BlackSmokeDMax

Quote from: dburgdorf on April 14, 2017, 11:16:23 AM
I don't actually use it myself, but I believe Fluffy's Work Tab both breaks down work types into their component elements, allowing for more detailed settings of exactly what each pawn is and isn't supposed to do, and allows priorities to be assigned on a 1-9 scale instead of a 1-4 scale.

Fluffy's work tab does do both, one is optional, the other is something you can set.

For the numbers, you can set them from 1-x where 9 is the maximum x.

For the breakdown into certain jobs, that is the advanced "Dwarf Therapist" mode. You can use that or not and still have the 1-x numbers.

SnoggyTheBear

Quote from: BlackSmokeDMax on April 14, 2017, 01:42:21 PM
Quote from: dburgdorf on April 14, 2017, 11:16:23 AM
I don't actually use it myself, but I believe Fluffy's Work Tab both breaks down work types into their component elements, allowing for more detailed settings of exactly what each pawn is and isn't supposed to do, and allows priorities to be assigned on a 1-9 scale instead of a 1-4 scale.
WorkTab sounds interesting but I just want the scale none of that extra stuff.
Fluffy's work tab does do both, one is optional, the other is something you can set.

For the numbers, you can set them from 1-x where 9 is the maximum x.

For the breakdown into certain jobs, that is the advanced "Dwarf Therapist" mode. You can use that or not and still have the 1-x numbers.

Szara

The in-depth job by job format is optional, you can just use it to have a 1-9 priority, that's what I do. By default the work tab starts in the simple on/off mode like vanilla, and you click to enable the numerical priorities, that's it.

And I doubt anyone is going to remake Fluffy's work tab for the sake of removing 75% of it but otherwise doing the exact same thing.
Yest' chelovék, yest' probléma. Net chelovéka, net problémy.
If there is a person, there is a problem. If there is no person, then there is no problem.

SnoggyTheBear

Quote from: Szara on April 22, 2017, 11:53:58 PM
The in-depth job by job format is optional, you can just use it to have a 1-9 priority, that's what I do. By default the work tab starts in the simple on/off mode like vanilla, and you click to enable the numerical priorities, that's it.

And I doubt anyone is going to remake Fluffy's work tab for the sake of removing 75% of it but otherwise doing the exact same thing.
Yeah the only reason I was hesitant on using it was because I only wanted the 1-9 based on your information I'm going to try it out.